View this page in
| Text Size
| Facebook Icon Twitter Icon

Notice of MassDOT Public Hearing on Improvemnts Along Portions of Route 138

A Design Public Hearing will be held by MassDOT to discuss the proposed Corridor Improvements along Depot Street (Route 123) from Newell Circle to Washington Street (Route 138) project in Easton, MA.



The attached flyer and handout provide additional information.

WHERE: Easton Town Hall – 1st Floor, Colleen Corona Board Room, 136 Elm Street, Easton, MA 02356

WHEN: Tuesday, June 12, 2018 @ 6:00 PM

PURPOSE: The purpose of this hearing is to provide the public with the opportunity to become fully acquainted with the proposed Corridor Improvements along Depot Street (Route 123) from Newell Circle to Washington Street (Route 138) project. All views and comments made at the hearing will be reviewed and considered to the maximum extent possible.

PROPOSAL: The proposed project consists of addressing deteriorated pavement and multi-modal accommodation through reconstruction of the roadway (minor widening) to provide bicycle accommodation in addition to reconstructed sidewalks and extensions. The project is 2 miles in length. A traffic signal is proposed at the Depot Street/Center Street/Porter Street intersection. The project also includes drainage system upgrades and new pavements markings and signs.